Bio-engineered solution for coastal erosion protection, pt.9

Woods Hole Group’s biodegradable erosion control project at Bayswater Seaside in New Seabury, MA is now complete.  We are very pleased with the construction and the final results.  Woods Hole Group will continue to monitor the performance of the installation, and we’ll provide updates as they become available.

For more information on this project, read our project description and updates (part 2, part 3, part 4, part 5, part 6, part 7, part 8).

Advertisements
This entry was posted in beaches, bio-engineering, coastal erosion, planning, shoreline erosion, Uncategorized and tagged , , , , , , , , , , , , , . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s