Bio-engineered solution for coastal erosion protection, pt.7

Update from Woods Hole Group’s bio-engineered erosion control project at Bayswater Seaside in New Seabury, MA:  the final sand envelope lift has been installed, and we are awaiting delivery of the anchors before the fiber rolls can be placed at the top of the bank next week.

For more information on this project, read our project description and updates (part 2, part 3, part 4, part 5, part 6).

Advertisements
This entry was posted in beaches, bio-engineering, coastal erosion, planning, shoreline erosion, Uncategorized and tagged , , , , , , , , , , , , , . Bookmark the permalink.

1 Response to Bio-engineered solution for coastal erosion protection, pt.7

  1. Pingback: Bio-engineered solution for coastal erosion protection, pt.8 | 2Fathom

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s